Week Three – 2013 Build

The transmissions and shooter wheel components have arrived!  The shooting platform tilting mechanism will be through a pair of Igus lead screws.  The design was completed and all components were ordered and expedited.  This was our heavy lifting week where components are starting to come together and look like a robot!  The shooter was tested and refined – we were able to shoot Frisbees through the 2 and 3 point slots at 60 feet.  At the end of the week the drive train and pneumatic system was successfully tested.